Authority | Project Name | Pipe Details | FY |
---|---|---|---|
GAIL India Limited | Pipeline Installation by HDD method Across RIL CORRIDOR for LPL Capacity Augmentation Project of M/s GAIL (India) Ltd. | 8.625" +6" OD MS Pipe | 2020-21 |
Indial Oil Corporation Limited | Installation of 6.625” OD Pipeline across Major River Gandak in Sonepur to Hajipur section of Muzaffarpur, Vaishali, Samastipur & Saran GA (Saran GA) by HDD Technique and Associated Works | 6.625 " OD + 4" Conduit | 2022-23 |
Indial Oil Corporation Limited | Realignment of Pipeline through HDD method in 12.75" OD Pipeline at Ch. 147.400 Km of PRPL | 12.75" OD + 4.5" Conduit | 2023-24 |
Indial Oil Corporation Limited | Realignment of pipeline by HDD method across NHAI, Dehradun for Road crossing (NH-73) at CH: 107.610 Km of KRNPL pipeline | 10.75" OD MS pipe | 2020-21 |
GAIL India Limited | HDD & Associated work for additional unlisted crossing of Kochi to mangalore pipe line project (Phase-II) | 24" + 6" NB API 5L Gr. X 80, 10.3mm thk / X-70, 11.9 mm thk and CS conduit of size 150 NB X 6.4 mm | 2018-19 |
Oil India | River_Dhansiri | 16 " dia pipe | 2019-20 |
Numaligarh Refinery Limited | Installation of 26" +6" pipeline across Godadhar River by HDD | 26" OD + 6" Conduit | 2023-24 |
Indradhanush Gas Grid Limited | HDD work for 24" + 6" pipe laying at Gilandhari River at Ch: 154.352 Km | 24" OD + 6" conduit | 2022-23 |
Indradhanush Gas Grid Limited | HDD work for 24" + 6" pipe laying at Noa River at Ch: 31.004 Km | 24" OD + 6" conduit | 2022-23 |
GAIL India Limited | HDD work for 24" + 6" pipe laying at Kaljani River (CH: 434+297 KM) & Godadhar River (CH: 440+221.0 KM) | 24" OD + 6" conduit | 2022-23 |
GAIL India Limited | Laying of 24" dia pipeline along with 6" CS conduit pipe by HDD method for GAIL- Laying & Construction od Steel Gas Pipeline and Terminals along with Associated Facilities for Barauni- Guwahati Pipeline Project0 Section III | 24" OD + 6" conduit | 2023-24 |
GAIL India Limited | HDD work for 18" + 6" pipe laying at for Paradeep Spurling of JHBDPL Ph-II | 18" OD + 6" Conduit | 2023-24 |
Indial Oil Corporation Limited | IOCL Paradip Hyderabad Pipeline Group B Project | Pipeline works 16" OD + 89 MM OD CONDUIT PIPE BUNDLE | 2019-20 |
Indial Oil Corporation Limited | KDPL Pipe line project | 12.75" + 10.75" + 6.625" + 4" Dia pipe | 2019-20 |
Indial Oil Corporation Limited | HBPL pipe line Project | 30 " + 3" Dia pipe for soft Strata | 2019-20 |
Indial Oil Corporation Limited | PHDPL Augmentation Project | Horizontal Directional Drilling of 14" + 3" Dia pipe for - Rocky Strata | 2019-20 |
Oil India | Rajasthan | ||
GAIL India Limited | Auraiya - Phulpur Pipeline Project | 24.75" OD 14.3 mm thk. Pipe along with 6" CS Conduit | 2017-18 |
GAIL India Limited | KVPL Replacement Project | 20" Pipe | 2015-16 |
GAIL India Limited | KG- Basin | 18" Pipe | 2015-16 |
Hindustan Petrolium Corporation Ltd. | Part- B of Palanpur - Baroda Pipeline | 18" dia Pipeline + 6" CS Conduit | 2017-18 |
Indial Oil Corporation Limited | KVPL Replacement Project | 18" Pipe + 0.438 " OFC | 2016-17 |
Indial Oil Corporation Limited | KVPL Replacement Project | 18" Pipe + 0.438 " OFC | 2017-18 |
Hindustan Petrolium Corporation Ltd. | VVSPL Pipeline Re-Routing Work | 18" Pipe | 2015-16 |
Indial Oil Corporation Limited | Jaipur-panipat- Naptha Pipeline(JPNPL) Project | 12.75" OD X 0.438" WT and Conduit of 89mm OD | 2017-18 |
Indial Oil Corporation Limited | Re-routing of existing BarauniKanpur Pipeline in different stretches between Mughalsarai and Kanpur | 12" OD Steel Pipe | 2017-18 |
GAIL India Limited | Pipe line Replacement Work, Gujara Region, Phase-I | 12" Pipe + 6" OFC | 2016-17 |
Indian Oil Corporation Limited | Paradip Haldia Durgapur LPG Pipe Line | 10.75" Pipe + 3" OFC | 2016-17 |
Indian Oil Corporation Limited | Paradip Haldia Durgapur LPG Pipe Line | 10.75" Pipe + 3" OFC | 2017-18 |
Indian Oil Corporation Limited | Paradip Haldia Durgapur LPG Pipe Line | 10.75" Pipe + 3" OFC | 2017-18 |
Indian Oil Corporation Limited | Paradip Haldia Durgapur LPG Pipe Line | 10.75" Pipe + 3" OFC | 2018-19 |
Indial Oil Corporation Limited | Kolkata ATF Projects | 8" Pipe | 2015-16 |
Indial Oil Corporation Limited | Kolkata ATF Projects | 8" Pipe | 2016-17 |
Indial Oil Corporation Limited | Kolkata ATF Projects | 8" Pipe | 2017-18 |
Indial Oil Corporation Limited | Kolkata ATF Projects | 8" Pipe | 2018-19 |
Indial Oil Corporation Limited | Paradip Haldia Durgapur LPG Pipe Line | 10.75" Pipe + 3" OFC | 2016-17 |
Indial Oil Corporation Limited | Paradip Haldia Durgapur LPG Pipe Line | 10.75" Pipe + 3" OFC | 2017-18 |
Indial Oil Corporation Limited | Paradip Haldia Durgapur LPG Pipe Line | 10.75" Pipe + 3" OFC | 2017-18 |
Indial Oil Corporation Limited | Replacement OD 47 KM Pipe Segment in Barauni-Patna Section of BKPL | 12" Pipe | 2016-17 |
GAIL India Limited | KG- Basin, Part-1, Phase-II | 8" Pipe + 6" OFC | 2016-17 |
Gujarat Gas Limited | Jamnagar Ring, Phase-2 connectivity | 8" Pipe | 2017-18 |
GAIL Gas Limited | City Gas Distribution Project at Bangalore | 8" Pipe | 2016-17 |
GAIL India Limited | Pile line Replacement Project, KG Basin-Part 1, Phase-II | 8" & 6" Pipe | 2016-17 |
Gujarat Gas Limited | Rankua - Vansada Pipeline Project | 6" OD Steel pipe in Rocks | 2017-18 |