Completed Works

Home-Completed Works

Completed Works

Authority Project Name Pipe Details FY
GAIL India Limited Pipeline Installation by HDD method Across RIL CORRIDOR for LPL Capacity Augmentation Project of M/s GAIL (India) Ltd. 8.625" +6" OD MS Pipe 2020-21
Indial Oil Corporation Limited Installation of 6.625” OD Pipeline across Major River Gandak in Sonepur to Hajipur section of Muzaffarpur, Vaishali, Samastipur & Saran GA (Saran GA) by HDD Technique and Associated Works 6.625 " OD + 4" Conduit 2022-23
Indial Oil Corporation Limited Realignment of Pipeline through HDD method in 12.75" OD Pipeline at Ch. 147.400 Km of PRPL 12.75" OD + 4.5" Conduit 2023-24
Indial Oil Corporation Limited Realignment of pipeline by HDD method across NHAI, Dehradun for Road crossing (NH-73) at CH: 107.610 Km of KRNPL pipeline 10.75" OD MS pipe 2020-21
GAIL India Limited HDD & Associated work for additional unlisted crossing of Kochi to mangalore pipe line project (Phase-II) 24" + 6" NB API 5L Gr. X 80, 10.3mm thk / X-70, 11.9 mm thk and CS conduit of size 150 NB X 6.4 mm 2018-19
Oil India River_Dhansiri 16 " dia pipe 2019-20
Numaligarh Refinery Limited Installation of 26" +6" pipeline across Godadhar River by HDD 26" OD + 6" Conduit 2023-24
Indradhanush Gas Grid Limited HDD work for 24" + 6" pipe laying at Gilandhari River at Ch: 154.352 Km 24" OD + 6" conduit 2022-23
Indradhanush Gas Grid Limited HDD work for 24" + 6" pipe laying at Noa River at Ch: 31.004 Km 24" OD + 6" conduit 2022-23
GAIL India Limited HDD work for 24" + 6" pipe laying at Kaljani River (CH: 434+297 KM) & Godadhar River (CH: 440+221.0 KM) 24" OD + 6" conduit 2022-23
GAIL India Limited Laying of 24" dia pipeline along with 6" CS conduit pipe by HDD method for GAIL- Laying & Construction od Steel Gas Pipeline and Terminals along with Associated Facilities for Barauni- Guwahati Pipeline Project0 Section III 24" OD + 6" conduit 2023-24
GAIL India Limited HDD work for 18" + 6" pipe laying at for Paradeep Spurling of JHBDPL Ph-II 18" OD + 6" Conduit 2023-24
Indial Oil Corporation Limited IOCL Paradip Hyderabad Pipeline Group B Project Pipeline works 16" OD + 89 MM OD CONDUIT PIPE BUNDLE 2019-20
Indial Oil Corporation Limited KDPL Pipe line project 12.75" + 10.75" + 6.625" + 4" Dia pipe 2019-20
Indial Oil Corporation Limited HBPL pipe line Project 30 " + 3" Dia pipe for soft Strata 2019-20
Indial Oil Corporation Limited PHDPL Augmentation Project Horizontal Directional Drilling of 14" + 3" Dia pipe for - Rocky Strata 2019-20
Oil India Rajasthan
GAIL India Limited Auraiya - Phulpur Pipeline Project 24.75" OD 14.3 mm thk. Pipe along with 6" CS Conduit 2017-18
GAIL India Limited KVPL Replacement Project 20" Pipe 2015-16
GAIL India Limited KG- Basin 18" Pipe 2015-16
Hindustan Petrolium Corporation Ltd. Part- B of Palanpur - Baroda Pipeline 18" dia Pipeline + 6" CS Conduit 2017-18
Indial Oil Corporation Limited KVPL Replacement Project 18" Pipe + 0.438 " OFC 2016-17
Indial Oil Corporation Limited KVPL Replacement Project 18" Pipe + 0.438 " OFC 2017-18
Hindustan Petrolium Corporation Ltd. VVSPL Pipeline Re-Routing Work 18" Pipe 2015-16
Indial Oil Corporation Limited Jaipur-panipat- Naptha Pipeline(JPNPL) Project 12.75" OD X 0.438" WT and Conduit of 89mm OD 2017-18
Indial Oil Corporation Limited Re-routing of existing BarauniKanpur Pipeline in different stretches between Mughalsarai and Kanpur 12" OD Steel Pipe 2017-18
GAIL India Limited Pipe line Replacement Work, Gujara Region, Phase-I 12" Pipe + 6" OFC 2016-17
Indian Oil Corporation Limited Paradip Haldia Durgapur LPG Pipe Line 10.75" Pipe + 3" OFC 2016-17
Indian Oil Corporation Limited Paradip Haldia Durgapur LPG Pipe Line 10.75" Pipe + 3" OFC 2017-18
Indian Oil Corporation Limited Paradip Haldia Durgapur LPG Pipe Line 10.75" Pipe + 3" OFC 2017-18
Indian Oil Corporation Limited Paradip Haldia Durgapur LPG Pipe Line 10.75" Pipe + 3" OFC 2018-19
Indial Oil Corporation Limited Kolkata ATF Projects 8" Pipe 2015-16
Indial Oil Corporation Limited Kolkata ATF Projects 8" Pipe 2016-17
Indial Oil Corporation Limited Kolkata ATF Projects 8" Pipe 2017-18
Indial Oil Corporation Limited Kolkata ATF Projects 8" Pipe 2018-19
Indial Oil Corporation Limited Paradip Haldia Durgapur LPG Pipe Line 10.75" Pipe + 3" OFC 2016-17
Indial Oil Corporation Limited Paradip Haldia Durgapur LPG Pipe Line 10.75" Pipe + 3" OFC 2017-18
Indial Oil Corporation Limited Paradip Haldia Durgapur LPG Pipe Line 10.75" Pipe + 3" OFC 2017-18
Indial Oil Corporation Limited Replacement OD 47 KM Pipe Segment in Barauni-Patna Section of BKPL 12" Pipe 2016-17
GAIL India Limited KG- Basin, Part-1, Phase-II 8" Pipe + 6" OFC 2016-17
Gujarat Gas Limited Jamnagar Ring, Phase-2 connectivity 8" Pipe 2017-18
GAIL Gas Limited City Gas Distribution Project at Bangalore 8" Pipe 2016-17
GAIL India Limited Pile line Replacement Project, KG Basin-Part 1, Phase-II 8" & 6" Pipe 2016-17
Gujarat Gas Limited Rankua - Vansada Pipeline Project 6" OD Steel pipe in Rocks 2017-18